In this going away shot we see the full 8,256 feet of CSX I028 as it heads north across the Ohio River Bridge and viaduct on the CSX Henderson Subdivision from Henderson, Kentucky on April 19th, 2022. Between the viaduct and the bridge the total span above ground is just at 4.5 miles long.


The current viaduct and bridge were built by the L&N railroad and were dedicated on the last day of 1932 at a cost about $4 million. It replaced one erected in 1885, also built by the L&N, which at that time was the longest channel span of that type in the world at 2.3 miles long.


Tech Info: DJI Mavic Air 2S Drone, RAW, 22mm, f/2.8, 1/2000, ISO 160


#trainphotography #railroadphotography #trains #railways #dronephotography #trainphotographer #railroadphotographer #jimpearsonphotography

CSX I028 northbound over the Ohio River at Henderson, Kentucky with a 8,256 ft train

In this going away shot we see the full 8,256 feet of CSX I028 as it heads north across the Ohio River Bridge and viaduct on the CSX Henderson Subdivision from Henderson, Kentucky on April 19th, 2022. Between the viaduct and the bridge the total span above ground is just at 4.5 miles long.

The current viaduct and bridge were built by the L&N railroad and were dedicated on the last day of 1932 at a cost about $4 million. It replaced one erected in 1885, also built by the L&N, which at that time was the longest channel span of that type in the world at 2.3 miles long.

Tech Info: DJI Mavic Air 2S Drone, RAW, 22mm, f/2.8, 1/2000, ISO 160