February 20, 2020 - A Chicago Transit Authority Brown Line and Green Line trains round curves at Tower 12 as they make their way around the downtown Chicago, Illinois "L". The first "L" (elevated) train (then Chicago and South Side Rapid Transit Railroad) was built in 1892, and its inaugural journey took place on June 6, spanning 3.6 miles in 14 minutes.

Chicago Transit Authority Brown Line and…

February 20, 2020 – Chicago Transit Authority Brown Line and Green Line trains round curves at Tower 12 as they make their way around the downtown Chicago, Illinois “L”. The first “L” (elevated) train (then Chicago and South Side Rapid Transit Railroad) was built in 1892, and its inaugural journey took place on June 6, spanning 3.6 miles in 14 minutes.