July 9, 2016 – LORAM Railgrinder RGS-9 at Rankin, Ky

July 9, 2016 – LORAM Railgrinder RGS-9 arries at the south end of Rankin Siding at Rankin, Ky to begin it's night of grinding switches and crossings on CSX's Henderson Subdivision. - Tech Info: 1/40 | f/1.4 | ISO 2000 | Lens: Nikon 50mm on a Nikon D800 shot and processed in RAW.

July 9, 2016 – LORAM Railgrinder RGS-9 arrives at the south end of Rankin Siding at Rankin, Ky to begin it’s night of grinding switches and crossings on CSX’s Henderson Subdivision. – Tech Info: 1/40 | f/1.4 | ISO 2000 | Lens: Nikon 50mm on a Nikon D800 shot and processed in RAW.